Welcome to Concrete Pro LA. Get a Free Quote

Concrete Pumping Project

Concrete Pumping
Delivering smooth, efficient concrete placement with high-reach pumping systems designed for accuracy, speed, and reliable results on every project.

Project Summery

Boom pump pouring structural concrete over heavy rebar grid on a commercial construction site in Los Angeles

Project description

This concrete pumping project showcases large-scale structural concrete placement using a boom pump system designed for accuracy, speed, and high-volume delivery. The images above highlight our crew coordinating rebar reinforcement, formwork, and controlled concrete flow during the pour — essential steps for creating a strong, stable structural slab capable of supporting heavy loads.

Before pumping began, our team installed an extensive rebar grid and prepared the form system to ensure the slab met engineering requirements. Using a specialized boom pump, concrete was delivered evenly across wide sections, allowing for fast placement in areas that cannot be reached by traditional methods. This process ensures consistent density, proper consolidation, and a uniform finish across the entire slab.

Crew working with boom pump to place concrete across reinforced structural slab during construction

Key Details

  • Location: Commercial Construction Site – Los Angeles, CA
  • Work Type: Structural slab concrete pumping
  • Construction Method: Boom pump concrete placement over heavy rebar reinforcement
  • Equipment Used: Boom pump truck, vibrators, rebar tools, safety rigging
  • Special Features: Large-span coverage, precise concrete flow, elevated structural base

Our approach & solution

Our approach focused on accurate placement and efficient delivery across a reinforced structural platform. We coordinated pump operators and ground crews to maintain smooth, continuous concrete flow while ensuring the mix properly consolidated around the rebar grid.

Using boom arm extensions, we reached deep and elevated areas quickly, reducing delays and improving material consistency. Vibrators and finishing tools were used to eliminate air pockets, resulting in a strong, level structural surface built for long-term performance.

Result

The completed concrete placement produced a solid, reinforced structural slab with superior durability and uniformity. Using boom pumping allowed for faster, safer, and more precise construction — delivering a high-quality concrete foundation ready for further structural development.

Choose Options
RTL Version
  • RTL Version
  • LTR Version
Want Sticky Header
  • No
  • Yes
Dark Verion
  • Yes
  • No
You will find much more options for colors and styling in admin panel. This color picker is used only for demonstation purposes. buy now buy now